DAP Concrete Floor Leveler 25 lb Bag, Gray, Portland Cement Underlayment
You Also Need the Bonding Liquid, and You Need the Gallon
DAP specifies 2.5 quarts of Bonding Liquid for a 25 lb bag. That is more than a pint and less than a gallon, so the gallon is the size that pairs with this bag. Buying the pint alongside it would leave you well short of a single mix. We would rather say that here than have it discovered on the floor with a bag already open.
| This 25 lb bag needs | 2.5 quarts of DAP Bonding Liquid and Floor Leveler Additive |
| So buy | The 1 gallon size, which covers this bag with about 1.5 quarts spare |
| Do not buy | The 1 pint size for this bag. A pint pairs with DAPโs 5 lb bag, not the 25 lb. |
What It Is For
- Levelling rough and uneven surfaces before finished flooring goes down.
- Preparing subfloors for tile, wood, vinyl sheet, vinyl tile and carpet.
- Patios, sidewalks, garages, steps and curbs, since it works outdoors as well as in.
- Concrete, masonry and wood subfloors, interior or exterior.
Specifications
| Manufacturer name | DAP Concrete Floor Leveler, Dry Mix |
| DAP item number | 10416 for the 25 lb bag |
| Base | Portland cement |
| Coverage | 25 sq ft per 25 lb bag at 1/8 inch |
| Thickness | 1/8 inch minimum, 1 inch maximum total |
| Mixing ratio | 25 lb powder to 2.5 quarts DAP Bonding Liquid |
| Working time | 45 minutes |
| Set time | 3 to 4 hours |
| Before floor covering | 24 hours |
| Full cure | 28 days |
| Minimum application temperature | 40 F |
| VOC | 0 g/L |
| Colour | Gray |
| Compressive strength | Not published by DAP |
Limitations DAP States
- Not for repairs over 1 inch total thickness.
- Do not mix more than you can use in 45 minutes.
- Do not use the mix once it has started to set. Retempering a setting cement mix ruins it.
How to Get a Flat Result
- Clean the substrate properly. Anything loose, oily or dusty will show up as a debond later.
- Mix powder into the Bonding Liquid, not the other way round, and mix to a lump free consistency.
- Work in manageable areas. Forty five minutes goes quickly across a large floor.
- Build up to depth in passes rather than exceeding an inch in one go.
- Give it 24 hours before you walk on it or lay a floor covering, and remember full cure is 28 days.
Not sure how many 50 LB bags of polymeric sand your paver project will need? Try our Polymeric Sand Calculator